Logotipo DYWIDAG
Nuestros productos

Los innovadores productos de DYWIDAG están diseñados para mejorar la integridad estructural, aumentar la eficacia de la construcción y garantizar la durabilidad a largo plazo.

Harbor Bridge: Delivering a Future-Ready Stay Cable System

North America’s newly constructed cable-stayed bridge in Corupus Christi, Texas, is a future-ready structure designed to improve mobility, enhance safety, and expand harbor access for decades to come.

Project scope

The Texas Department of Transportation (TxDOT) set out to replace the aging 1950s Harbor Bridge in Corpus Christi with a modern cable-stayed structure to improve safety, ease congestion, and increase navigational clearance for one of the busiest ports in the United States. The new bridge spans 1,661 ft with a total length of 3,295+ ft, making it North America’s longest concrete segmental cable-stayed bridge.

To support this landmark project, DYWIDAG delivered 152 stay cable systems, tie-down cables and specialized equipment compliant with Buy America standards. The team worked closely with the main contractor to address challenges and scheduling requirements.

Project wins

  • Team composition: Experienced specialists with strong technical and site execution backgrounds, combined with a focus on safety requirements

  • Seamless integration: Stay cable installation was critical on the path to site progress, requiring smooth execution under pressure, achieved through close integration and effective stakeholder communication

  • Adaptive delivery: Despite pandemic-related delays and design challenges, milestones were met through accelerated schedules and flexible planning.

  • Global supply, local compliance: Full Buy America compliance with access to global expertise and sourcing where applicable

Challenge

The design requirements for the new Corpus Christi Harbor Bridge project included building the longest concrete segmental cable-stayed bridge in the US, designed for a 170-year service life, with specific structural, safety, and aesthetic features. Key challenges involved ensuring the design met all safety specifications, managing complex construction logistics in harsh environmental conditions.

This ambitious project required a partner with proven stay cable technology, specialized installation equipment, and experienced technical teams. The stay cable partner also needed to ensure full Buy America compliance, access to global supply chains (where applicable), and seamless integration with the main contractor activities to minimize risk.

What we delivered

DYWIDAG delivered the main deck support system and provided end-to-end technical expertise, including:

  • 152 stay cable systems (Dyna-Grip® DG-E series) Designed for high fatigue resistance and long-term durability.

  • 24 tie-down cables and 8 temporary stays Critical for structural stability during construction phases

  • Over 3,700 USt of 0.6” epoxy-coated strand Offering superior corrosion protection for Gulf Coast conditions

  • Purpose-built installation equipment Engineered for large-scale cable works to ensure precision and safety

  • On-site technical supervision and training Integrated with the main contractor’s workforce for efficient execution

  • Multiple system sizes (DG-E 73, 85, 91, 109, 121) Providing flexibility to match varying load demands across the span

The DG-E system combines DYWIDAG’s proprietary Dyna-Grip® anchorage technology with epoxy-coated strands, delivering strength, durability, and compliance. Proven worldwide, this system is trusted on iconic bridges in France, the USA, and Thailand.

Results and impact

Despite pandemic-related delays and extended design-phase discussions, DYWIDAG met all installation milestones through adaptive scheduling and integrated workforce planning. The project achieved full Buy America compliance while leveraging global supply chains, demonstrating DYWIDAG’s ability to balance regulatory requirements with technical delivery.

This successful project delivered a future-ready structure designed to improve mobility, enhance safety, and expand harbor access for decades to come.

Stay Cable SystemInstallation

The Texas Department of Transportation (TxDOT)

Flatiron Dragados, LLC

ARUP & C.F.C

Share

linkedinfacebooktwitteremail