The Sannohe-Bokyo bridge is a three-span, extradosed prestressed concrete bridge with a total length of 400 m.
Context
It runs from east to west, connecting the Nanbu-cho, Sannohe-cho, and Takko-machi, Aomori Prefecture's agricultural development areas. This bridge was designed as an extradosed continuous girder, since this construction method was deemed best in view of the geographical conditions that existed at the site. The Mabuchi River that is to be crossed runs through very uneven territory there.
Due to its classification as a category A river, it must be particularly protected. Category A means that that river is important for the national economy and the welfare of the population. To protect the river and at the same time cross the Aoimori line (former JR Tohoku line) and the Sannohe town road, a main span length of 200m was required.
Solution
At the time of its completion in early 2005, this structure held the world record for an extradosed bridge with a main girder constructed solely of prestressed concrete. The Sannohe-Bokyo bridge is the first extradosed bridge in Japan to use shop fabricated multi-epoxy tendons.
These tendons were made of prestressing steel strands coated with a fine-grain epoxy resin. This way, the service life was increased and the construction period considerably reduced. The shop-fabricated-multi-epoxy tendons were transported to the site where they were installed in the structure. Large bridge sections were first completely assembled on the ground and then lifted into their final position by means of a crane and an electric winch and installed.