Innovative Concept for the Construction of an Office Building

In order to overcome the challenges of temperature and time, DYWIDAG developed a special grouting method for their DYWIDAG Bonded Multistrand Tendons.

loader

Context

A new 38 story tall office building was erected for in the heart of Calgary.

The extreme cold of the Canadian winter during the structural work presented a particular challenge. The normal grouting operation would have required the complete slab to be heated for an additional 3 days, before the forms could have been moved to the next level. In addition, this construction method would have considerably delayed completion and would have incurred high cost.

The contract included the supply of anchorage components and tendons prefabricated in the DYWIDAG fabrication plant as well as technical support during the construction works.

Solution

loader

Due to those challenges, the contractor decided to grout the tendons after the outer curtain wall had been erected. However, this meant the strands would have to be in place for up to five months before the tendons were grouted.

To protect the tendons and anchorages until grouting could take place, DYWIDAG developed a special plastic grout cap that was permanently left in place after grouting. In addition, a corrosion inhibitor was applied to the DYWIDAG Bonded Multistrand Tendons during the period when the tendons remained ungrouted.

For the construction of the TransCanada Pipeline Building 370t of bonded multistrand tendons were used. Each typical floor included a total of 34 tendons ranging in size from 9/0.6" strands to 24/0.6" strands with tendon lengths varying from 15 m to 40 m.

As a result of the use of innovative ideas and a commitment to high quality standards the building was completed on schedule (an impressive 5-day cycle) and on budget to the full satisfaction of the owner.

SupplyTechnical assistanceSupervisionDetailing of shop drawings

TransCanada Pipeline, Calgary, AB, Canada

Yolles Partnership Inc., Toronto, ON, Canada

JV PCL Maxam, Calgary, AB, Canada