In December 2015, the Jandam 700 Grouted Sill Pillar Project started at the Pajingo Gold Mine, which is operated by Evolution Mining and located in Queensland in northeastern Australia.

For this project, the pillars that had been left to support the mined drifts underground had to be consolidated using grout in order to ensure the stability of the galleries and permit future excavation work. DSI supplied 200 x 1,200kg bulker bags of DYWI® HY Grout, which is a high yield, low strength product that can be mixed at different water to powder ratios, producing different yield factors.